On 18 September 2026, the FACI plant shipped a FACI 761 industrial pellet boiler with an output of 761 kW in the Base configuration with a rear 2000-litre fuel hopper to Kurganinsk, Krasnodar Territory.
The FACI 761 is designed to heat production workshops, warehouses, greenhouses and social facilities. The boiler runs on pellets and can also use firewood and coal with a fraction of up to 25 mm; efficiency is up to 93%.
The 2000-litre hopper provides long autonomous operation without frequent fuel loading, and the rear position makes the boiler compact in width - convenient when the boiler room is long and narrow.
Even in the basic configuration, the boiler has a touch control panel and a Wi-Fi/Ethernet internet module for monitoring from a smartphone.
The boiler was loaded onto the truck by crane right in the plant's workshop and securely fastened for the long journey to southern Russia.