On 15 September 2026, the FACI plant sent three FACI 1000 industrial boilers of 1000 kW each to the Amur Region. The total output of the delivery is 3 MW.
All three boilers are equipped with left-hand 2000-litre hoppers, automatic ignition and a GSM module - the boilers ignite automatically, and notifications about faults and the state of the boiler house are sent to a phone. The large fuel supply ensures long autonomous operation without frequent loading.
The FACI 1000 is the flagship of the plant's automatic boiler range. The boiler runs on pellets, can use coal with a fraction of up to 25 mm and firewood, has an efficiency of up to 93%, touch control and an internet module for monitoring from a smartphone.
A cascade of several boilers is a reliable scheme for a large boiler house: the load is distributed between the units, and when one boiler is being serviced, the others keep working.
The Far East is one of the plant's regular delivery destinations: in early September FACI had already shipped boiler equipment to Vladivostok. The plant sends equipment to any region and helps arrange delivery.