On 10 July, the FACI plant shipped a second batch of equipment to the Republic of Karelia - two FACI 1000 Classico pellet boilers of 1000 kW each. Together with the three boilers sent the day before, the customer received five industrial units with a total output of about 4.3 MW.
Such projects show trust in the plant: when one manufacturer is chosen for an entire complex of facilities, what matters is the reputation of the equipment and the plant's ability to keep to the delivery schedule. Both batches were shipped exactly on time.
The FACI 1000 Classico is the flagship of the industrial range: the boiler is designed for continuous operation in boiler houses, is equipped with automatic fuel feed and is adapted to Russian operating conditions.
All units passed factory tests and quality control in Chelyabinsk, and were packed and sent to the customer fully ready for installation.
We thank our partners for their trust. The FACI team handles projects of any scale - from a boiler for a house to a multi-megawatt boiler house - from output selection to shipment.