Home News [Special project] Block-modular boiler houses made for the Jewish Autonomous Region

[Special project] Block-modular boiler houses made for the Jewish Autonomous Region

05.09.2023

FACI quickly manufactured and shipped two BMBHs to the Jewish Autonomous Region.

As part of a state programme to convert liquid fuel and coal boiler houses to pellet heating, FACI-RUS carried out a special project: two block-modular boiler houses (4000 and 5000 kW) with a universal fuel feed were manufactured for the Jewish Autonomous Region.

[Special project] Block-modular boiler houses made for the Jewish Autonomous Region

The boiler houses run on nine FACI boilers of 1000 kW each. The BMBHs are also equipped with:

  • heat exchangers;
  • hot water supply systems;
  • nine outdoor stores with automatic fuel feed, with a capacity of 17 m3 each;
  • staff rooms.
Elements of the block-modular boiler house Boiler in the BMBH

At the customer's request, we developed a universal fuel feed that also supports coal fuel in automatic mode in case pellets are unavailable.

After that, the FACI team promptly sent 9000 kW in the form of modular units to the customer. After all, the main advantage of block-modular boiler houses is that they are easy to install and transport or dismantle (and all this takes little time). In particular, the two boiler houses for the Jewish Autonomous Region consist of 18 transportable units carried on ordinary low-loaders without special permits. This is exactly why leasing companies often finance such projects.

  Block-modular boiler house         Preparing the BMBH for shipment

 Shipping the BMBH        BMBHs ready for shipment 

 
The customer only needs to place the units on site and connect them to the existing external networks (heat supply, water supply, sewerage). In general, installing a small block-modular boiler house usually takes 4 to 8 hours.

                                                                            Drawing of the block-modular boiler house building                                                      Drawing of the block-modular boiler house building

BMBH layout           

BMBH layout

Why is a ready-made boiler house better than a stationary one?

Stationary boiler house

FACI ready-made BMBH

As a rule, a long project:
- design;
- construction of the building;
- installation of boiler house piping;
- boiler installation.

The FACI ready-made boiler house is a serial product manufactured in just 15-20 working days.

The need to supervise
the construction of the boiler house.

The boiler house arrives on site fully assembled and is installed in 4 to 8 hours.

Impossible or very difficult to dismantle
and move to another site.

It can be quickly dismantled and easily transported to any other site or if sold. The FACI ready-made boiler house is built to transport dimensions and carried on a semi-trailer.

Complicated leasing paperwork.

The FACI ready-made boiler house is ready-made equipment that is easy to transport, so leasing companies quickly approve financing for such projects.

The warranty covers individual components
of the boiler house (pumps, boilers, shut-off valves)
from different suppliers.

A single factory warranty for the entire boiler house.

Requires a foundation and registration of a land
plot for construction.

Does not require a permanent foundation and can be installed on ordinary concrete blocks or a slab.


We and our team of representatives in all regions of Russia are ready to make boiler houses for you too! To get a proposal, click "Get a commercial proposal" and fill in the order form.

Choose only reliable, high-quality equipment!Make profitable purchases!

Choose a BMBH

Thank you for choosing FACI!