Even distribution of the heat carrier throughout the water jacket
Professional-grade welding quality
Efficiency up to 95%
Convenient connection and quick servicing
Low aerodynamic resistance
Special heat-resistant door lining and high-density casing insulation
Compactness
Reversible doors
Compared with two-pass boilers, the three-pass FACI GAS GRANDE has an additional row of convection tubes. This increases the number of passes of the hot flue gases and the heat exchange area, giving you a lower flue gas temperature and higher energy efficiency. Three-pass boilers burn fuel more completely and minimise harmful emissions into the atmosphere.
Only high-quality metal from leading domestic steel mills is used to build the boiler. Thanks to this, professionally made welds and multi-level quality control, the service life is up to 20 years. Every boiler body undergoes extreme hydraulic testing.
The three-pass furnace has a low combustion chamber heat release rate, which makes burner settings easy and minimises NOx in the flue gases. The boiler's low aerodynamic resistance and suitably sized furnace tube allow the best possible burner selection.
High-quality insulation keeps heat loss through the boiler casing to a minimum.
Reversible door with heat-resistant concrete lining.
|
Purpose |
Central heat supply for residential and administrative buildings, structures, warehouses and production facilities, office and apartment buildings, greenhouses and public utility buildings, as well as for various industrial processes. |
|
Fuel |
Gaseous and liquid fuels |
|
Transportability |
The boiler fits transport dimensions, requires no additional permits and is carried in accordance with cargo transport rules. |
|
Heat carrier |
Water, ethylene glycol |
|
Burners |
Single-stage, multi-stage, modulating. Fully compatible with most gas and liquid fuel burners. |
When running on gas and diesel fuel — 36 months from commissioning, but no more than 42 months from shipment from the manufacturer;
when running on heavy fuel (fuel oil, crude oil, etc.) — 12 months from commissioning, but no more than 18 months from shipment from the manufacturer.
The FACI boiler equipment plant carries out the full production cycle in-house. Materials arrive as sheet metal and seamless tubes and leave for the warehouse as finished products ready for you.
All FACI products are assembled on modern high-precision equipment by highly qualified professionals only. Every weld seam of a FACI boiler is a work of art.